Offshore
backMeerwind
The Meerwind Süd I Ost wind farm is located around 23 km north of Helgoland, and consists of a total of eighty wind turbines with a capacity of 3.6 megawatts each supplying up to 360,000 households a year with electricity.
In detail...
- Securing the monopiles on the seabed
- Delivery of offshore filter material to the fall-pipe vessel from our quarry in Jelsa
- Delivery of offshore material from our quarry in Larvik
all images (c) WindMW GmbH
Facts:
| Owner: | Boskalis |
|---|---|
| Customer: | WindMW GmbH |
| Construction time: | 2013 |
| Construction cost: | €1,200 million |
| Sub contractor: | Stema Shipping A/S and Mibau Baustoffhandel GmbH |
| Delivery quantity: | Quarter of a million tonnes of filter material and riprap |
|---|---|
| Purpose of use: | Scour protection for monopiles |