MS Beltnes in actie

Van de steengroeve in het Noorse Jelsa tot aan de terminal in Kiel

Productie in Jelsa

Krijg een indruk van onze productieprocessen!

Arrow
Arrow
Slider

Delivery of First Newbuild, MV Starnes

August 10, 2020, MV Starnes, the first of two CSL-Hartmann joint venture ships built at Chengxi Shipyard was successfully delivered to owners. Mibau Stema Group expects the vessel for the first laoding in Jelsa end of September.  

At a speed of 14 knots, the 40,000 DWT self-unloading ship successfully completed all dockside and sea trials and is now being prepared to sail to Jelsa via Suez Canal.   

 

Self-unloading system:

The vessel can self-discharge at a rate of 5,500 tph and is equipped with a 90.5 m boom, which is one of the longest and largest ever built for a self-unloader. The self-unloading system can handle lump sizes up to 300 mm and free flowing materials with a bulk density in the range of 1.2-3.5/t/m³.   

 

Environmentally friendly:

Starnes is fitted with energy saving Hub fins, an exhaust scrubber and a ballast water treatment system with IMO and USCG compliance.